History

2013
  • Installation of a modern surface inspection system

  • Installation of the new compressed air compressor 

2012
  • Installation of a modern gas boiler and shutting down of the thermal waste utilization system as well as of the existing gas and oil boiler systems.
  • Certification in accordance with FSC and PEFC Chain of Custody 

2011
  • Installation of a new process control system for raw material preparation 


2010
  • Installation of a new residual materials treatment plant


2007
  • Installation of a new process control system for the paper machine


2004
  • Installation of a slit-sorting system (commissioning, III. stage)


2003
  • Replacing of the steam-heated drying hood by a gas-heated high-temperature hood (up to 300 °C)


2002
  • Replacing of the glazing cylinder with a 5 m diameter one
  • Installation of a new mechanical wastewater treatment system

2001
  • Construction of a new warehouse for finished goods, fibrous raw materials and machine parts


1998
  • General overhauling of PM I and the pyrolysis system
  • Participation in the Eco-Management and Audit Scheme of the European Union for the first time 

1994
  • Extension of the finished goods store


1985
  • Commissioning of the waste heat utilization system


1979
  • Shutting down of the cellulose factory


1975
  • Shutting down and demolition of the two old paper machines


1970
  • Construction of the present paper machine with 470 cm working width